Below Ground

CONCRETE COMBITANK®


The new range of Vortech Concrete pump stations have been developed to comply with Sewers for Adoption 6th edition combined with the design protected Vortech Combitank.  These systems are deliverdd to site as a pre-packaged system and can be used with standard concrete rings in various sizes.   The valve chamber is completely assembled and can be installed either attached to the pump chamber on can be sited adjacent to the pump chamber connected with rocker pipes as required.  The system has been developed to minimise as many Health and Safety risks endangered with traditional on site pipework installation methods.

Assembled sequence

Assembled sequence

Concrete combitank assembled

Concrete combitank assembled

Concrete tank section

Concrete tank section